Can I add a new second processor to a ESX 3.0.2 host?
Do I have to run kudzu for it to be detected?
We are already licensed for SMP, will the SMP license be added?
Do I need to rerun the install/upgrade for the new second processor to be detected and ESX configured?
Will I lose my current configuration if I do an in-place upgrade install of the same version?
Should I upgrade to 3.5? (I am still reviewing the release notes)
Does 3.5 have ny issues with HP SIM VMM Agent 3.0 and/or HP Management Agent for VMware ESX Server 3.x version 7.9.0?.