Hi,
I have 2 ESX Server (esx1 and Esx 2) in a cluster and both have 12 GB Memory
Each of the esx have 10 machine with 1 GB Memory each.
I would like upgrade RAM - additional 8 GB to both esx server. Is it possible to vmotion based on the above limitation without shutting down the server?
How do I know if the resources are enough for vmotion to the other host?